These are for Premera Blue Cross main Campus
There was a massive sunken area all over this parking lot.
- We removed and replaced about 20,000 square feet of asphalt with some areas of excavation up to 12″
- We installed a new catch basin and tied it into the existing storm drain system.
- We removed and replaced approximately 650’ of curbing
- We restriped the parking lot in the new paving area.